In Cheyenne, Wyoming, electrical permits are required for any new construction or remodeling work that involves electrical power connections, disconnections, or restorations. While some electricians may skip pulling permits for minor jobs, it is essential to obtain the necessary permits to ensure compliance with safety regulations and avoid potential issues when selling a property. Cheyenne has specific procedures for obtaining electrical permits, including online applications and inspections, and failure to secure the required permits can lead to complications during inspections or when selling a home.
| Characteristics | Values |
|---|---|
| Location | Cheyenne, Wyoming |
| Permit Type | Electrical/Wiring Permit |
| Requirements | Required for any new construction, remodeling, or temporary service involving electrical work |
| Application Process | Online through a portal account or by contacting the Cheyenne office |
| Fees | $50 for electrical wiring permits; $40 for temporary wiring permits |
| Inspection | Required; the permit holder must schedule an inspection |
| Consequences of Non-Compliance | Potential issues during the sale of the property; possible need to expose work or obtain third-party certification |
Explore related products
What You'll Learn

Consequences of not pulling an electrical permit in Cheyenne
The consequences of not pulling an electrical permit in Cheyenne, Wyoming, can vary depending on the specific circumstances and the local regulations in the area. Here are some potential consequences to consider:
Firstly, it is important to understand that electrical permits are usually required by law for any significant electrical work, including new construction, remodeling, or alterations to a building's electrical system. In Cheyenne, electrical permits are specifically mandated before beginning any construction or remodeling that involves connecting, disconnecting, or restoring electrical power. Failure to obtain the necessary permits can result in legal repercussions.
One of the main consequences of not pulling an electrical permit is the potential for unsafe or non-compliant work. Electrical permits are in place to ensure that all electrical installations are inspected and meet the required safety standards and codes. Without a permit, there is no official oversight of the work, which could lead to hazardous conditions or code violations. This could put people at risk and result in potential liability issues for the property owner.
Additionally, the lack of an electrical permit can create complications when it comes time to sell a property. In some cities and municipalities, strict inspections are required at the point of sale, and the absence of the necessary permits could be a significant issue. In these cases, you may be required to retroactively obtain permits, expose previously concealed work for inspection, or provide third-party certification of the electrical work. This can be a costly and time-consuming process, potentially involving tearing open walls and other invasive procedures.
Furthermore, electrical permits provide important documentation of the work performed, which can be valuable when it comes to understanding the history of a property. A permit and inspection history can give future buyers peace of mind, knowing that the electrical systems have been properly installed and maintained. Without these records, buyers may be hesitant, potentially affecting the salability or value of the property.
Finally, there may be financial implications to not pulling an electrical permit. In some cases, power companies may refuse to reconnect electrical service without a proper inspection, resulting in additional fees or delays. Additionally, pulling permits and scheduling inspections upfront can help avoid unexpected costs down the line, as issues can be identified and addressed early on. While obtaining permits may incur some initial expenses, it can ultimately save money by preventing costly corrections or fines for non-compliance.
Electric Furnace Maintenance: What You Need to Know
You may want to see also
Explore related products

How to obtain an electrical permit in Cheyenne
Obtaining an electrical permit in Cheyenne, Wyoming, is a straightforward process, but it's important to ensure you have the correct licenses and permits before starting any electrical work. Here is a step-by-step guide on how to obtain an electrical permit in Cheyenne:
Firstly, it's important to determine if you need an electrical permit for the work you intend to carry out. Electrical permits are required for any new construction, remodeling, or temporary service that involves electrical work. This includes any work that will require a public utility to connect, disconnect, or restore electrical power. Some minor exemptions exist, such as changing a receptacle, GFCI, light fixture, or switch, but most electrical work will require a permit.
Secondly, if you are an Electrical Contractor, you must ensure you have an existing portal account. If you don't have an account, you can create one by contacting the Cheyenne office at 307-777-7288. They will grant you access to the plan review application and guide you through the process.
Once your account is set up, log in and access the "Applications" section. Here, you will find the contractor wiring permit application. Click the "Apply Now" button and carefully fill out the application form. Be sure to select "Wiring Permit" as the reason for your account creation; otherwise, you will not be able to apply for the permit.
After submitting your application, you will receive an email confirming that your account has been created and is being verified. Once the verification process is complete, you will receive another email containing your username and a link to set your password. You can then log in to your account and access the wiring permit guidelines, which you should read and agree to before proceeding.
Finally, if you choose a guaranteed inspection, it is your responsibility to contact the electrical inspector to schedule an inspection. You can find the contact information for your county's electrical inspector on the website, along with a map showing their jurisdiction.
Please note that there is a fee for obtaining an electrical wiring permit, which is currently $50. However, this fee is waived if you request and pay for an electrical inspection. Additionally, effective April 1, 2025, a processing fee of 2.5% will be assessed for each credit/debit transaction, with a minimum charge of $1.00 if the 2.5% is less than that amount.
How Energy-Intensive Are Dryers?
You may want to see also

Electrical permit requirements in Cheyenne
In Cheyenne, Wyoming, an electrical wiring permit is required before beginning any new construction or remodeling of any building, mobile home, or premises if the work will require a public utility to connect or disconnect and restore electrical power. Electrical permits are not mandatory for installations exempt under W.S. 35-9-123 (a)(ii) to (v), unless the electrical work is performed by a subcontractor and governed by the National Electrical Code.
Electrical wiring permits are available for temporary power and are issued for 90 days, unless a longer duration is requested. A permit is required for temporary service and costs $40. A fee of $50 is charged for any electrical wiring permit issued by the Department, but this fee is waived if an electrical inspection is requested and paid for.
To apply for an electrical permit in Cheyenne, you must have an existing portal account. You can contact the Cheyenne office at 307-777-7288 to gain access to the plan review application. Once you have an account, log in and click on "Applications" on the left side of the screen. From there, you can access the contractor wiring permit application and click the "Apply Now" button. After reading and agreeing to the wiring permit guidelines and completing the required information, you can submit your application. You will then receive an email acknowledging receipt of your application.
It is important to note that no work should be started before the Permit to Construct is issued. Additionally, for a guaranteed inspection, it is the permit holder's responsibility to schedule an inspection with the electrical inspector.
Electrical Synapses: Less Abundant, More Powerful?
You may want to see also

Cost of electrical permits in Cheyenne
In Cheyenne, Wyoming, electrical permits are required for any new construction or remodelling that involves connecting, disconnecting, or restoring electrical power. These permits are not required for installations exempt under W.S. 35-9-123 (a)(ii) to (v), unless the work is being performed by a subcontractor and is governed by the National Electrical Code.
The cost of electrical permits in Cheyenne is as follows:
- Temporary Wiring Permits: $40 for 90 days, as per Article 305 of The National Electrical Code.
- Electrical Wiring Permits: $50, unless an electrical inspection is requested and paid for, in which case the fee is waived.
- Effective April 1, 2025, a processing fee of 2.5% will be assessed for each credit/debit transaction, with a minimum charge of $1.00 if the 2.5% is less than that.
To obtain an electrical permit in Cheyenne, you must have an existing portal account and contact the Cheyenne office to gain access to the plan review application. Once you have submitted your application, you will receive an email notification and, after verification, another email with your user name and a link to set your password.
Wave Power: Converting Ocean Waves to Electricity
You may want to see also

Who to contact for electrical permits in Cheyenne
If you are an electrical contractor in Cheyenne, Wyoming, and need to obtain an electrical permit, you can do so through your portal account. An electrical wiring permit is required prior to beginning any new construction or remodeling of any building, mobile home, or premises if the work will require a public utility to connect or disconnect and restore electrical power.
Electrical permits are not required for installations exempt under W.S. 35-9-123 (a)(ii) through (v), unless the electrical work is being performed by a person or company acting as a subcontractor for the exempt person, partnership, or corporation, and the electrical work is governed by the National Electrical Code. Temporary electrical wiring permits are available for a fee of $50.00 and are valid for ninety days unless a longer duration is requested.
If you are an Electrical Contractor with an existing portal account, you can contact the Cheyenne office at 307-777-7288 to gain access to the plan review application. Once you have your account set up, you will receive an email with your username and a link to set your password.
If you chose a guaranteed inspection, it is the permit holder's responsibility to contact the electrical inspector to schedule an inspection. You can find your inspector's contact information by selecting your county from a dropdown menu or by referring to the map at the bottom of the page, which shows the inspectors' jurisdictions.
The Best Storage Methods to Keep Your Electric Shaver in Top Shape
You may want to see also
Frequently asked questions
If you don't pull an electrical permit, you may face consequences when you go to sell your house. In some cities, a strict city inspection is required at the time of sale, and the lack of permits for electrical work could mean that you have to tear down your walls to expose the work for inspection.
If you are an Electrical Contractor with an existing portal account, you can contact the Cheyenne office at 307-777-7288 to gain access to the plan review application. If you don't have an existing portal account, you can create one by selecting "Wiring Permit" as the reason for the account, filling out the remaining demographic information, and clicking "Submit". Once your account has been verified, you will receive an email with your username and a link to set your password. After that, you can log in to your account, navigate to the Applications page, and click the "Apply Now" button for the contractor wiring permit.
A fee of $50.00 shall be paid for any electrical wiring permit issued by the Department. The electrical wiring permit fee shall be waived for anyone requesting and paying for an electrical inspection. Temporary wiring permits are $40.00 and are issued for a period of ninety (90) days unless a longer duration is requested.