If you need to apply for electricity at Eskom, there are a few options available to you. Eskom offers a self-build connection project that allows you to connect to the national power grid faster and power your business operations earlier. You can also apply for an electricity connection for your house. The application process involves filling out an Eskom electricity application form, which can be done online through platforms such as DocHub, or by submitting it via email, link, or fax. Additionally, you can download, print, or make adjustments to the form before submitting it. Depending on your location, you can send your application to the relevant Eskom email address for your province or state.
| Characteristics | Values |
|---|---|
| Application method | Online, email, link, fax, download, print |
| Application form | Eskom electricity application form 2022 |
| Application fee | Applicable in some cases |
| Meter installation cost | Between R1,500 and R5,000 |
| Application process for prepaid meters | Research and gather information, create an online account, login and locate the prepaid meter application section, fill in the application form, upload required documents |
| Application-related queries | Submit to specified email addresses for different regions |
| Self-build connection | Customers can build their own electricity connection to connect to the national power grid faster |
Explore related products
What You'll Learn

Filling out the Eskom electricity application form
Once you have the form, begin by providing your personal details in the designated fields. This includes information such as your name, contact details, and address. Make sure to fill out all the required fields accurately and completely.
The next step is to indicate your supply requirements. Here, you need to specify the type of electricity connection you need, such as a new connection, an upgrade to an existing connection, or permission to connect electrical services as a tenant. Be sure to refer to Eskom's requirements for supply applications to ensure your request complies with their guidelines.
After that, provide the project specifics. This includes details such as the size of the embedded generator (kW), the phase and circuit breaker rating, and the dedicated transformer size. If you are a business owner, you may also need to provide additional documentation, such as business registration.
Finally, before submitting the application form, review it for accuracy and completeness. Attach any necessary documents, such as ID or proof of address, and ensure you have followed all the instructions provided by Eskom. You can then submit the form via email, fax, or physical submission to your local Eskom office. Remember to keep a copy of your submission for your records.
Electric Pressure Cookers: What's the Difference?
You may want to see also
Explore related products

Paying application fees
To apply for electricity at Eskom, you will need to fill out an application form. You can do this online, via email, or by fax. You can also download, export, or print the form and fill it out by hand.
Once you have completed the application form, you may need to pay an application fee. The fee will depend on the type and quality of your meter, as well as who you choose to do the installation. You can expect to spend between R1,500 and R5,000 for a domestic meter and installation.
There are several ways to pay the application fee. You can pay online through a secure payment portal or use a credit or debit card. You may also be able to pay by bank transfer or mobile money transfer, depending on the country and service provider. Some providers may also accept cash payments at designated payment centres.
It is important to note that if you are applying for a prepaid meter, you will need to check your KRN status before paying the application fee. To do this, enter 1844 6744 0738 4377 2416 on your meter's keypad. If the display shows KRN 2, your meter is updated, and you can proceed with the application. If it shows KRN 1, your meter requires recoding, and you will need to contact Eskom or a qualified electrician to assist you.
Once you have paid the application fee, you can proceed with the installation process. Prepaid meters can be installed by Eskom or any other qualified electrician. The installation involves connecting the meter to the electrical supply of the premises and registering the meter with Eskom.
Electric Fence Shock: A Sign to Heed
You may want to see also
Explore related products

Choosing the right application form version
When applying for electricity at Eskom, it is important to select the correct application form version to ensure a smooth and efficient application process. Here are some detailed instructions and considerations to help you choose the right version:
Firstly, identify the specific type of application you require. Eskom offers various services, including new electricity connections, additional supply, and prepaid meter installations. Determine whether you are applying for a residential or business connection, as the application forms may differ.
Secondly, consider the specific requirements of your premises. For instance, if you require a self-build connection project, where you construct the electricity connection yourself, there may be specific forms or documentation needed to expedite this process.
Thirdly, choose between an online or offline application process. Eskom provides the option to fill out and submit the application form online through platforms like DocHub, which offer tools to edit and customise the form. Alternatively, you can download, print, and submit the form physically via email, link, or fax.
Additionally, be mindful of the application fees. Some forms, such as those for prepaid meter installations, may require you to pay fees. Ensure you are aware of any applicable costs before submitting your application.
Lastly, consult the Eskom website or contact their customer support for guidance. They may provide a list of available application forms and their specific purposes, enabling you to make an informed decision about which version is most suitable for your needs. Refer to their contact information to reach out with any queries regarding the application process.
Electric Safety Edges: A Guide to Ordering
You may want to see also
Explore related products
$13.47 $22.45

Submitting the application to the correct email address
When submitting your Eskom electricity application, it is important to ensure that you are sending it to the correct email address. Eskom has provided a list of designated email addresses for application-related queries, which vary depending on your region.
For instance, if you are located in the Eastern Cape, you would send your query to [email protected] whereas, for the Free State, you would use [email protected]. It is essential to select the email address that corresponds to your specific region.
To ensure that your query is effectively addressed, Eskom also requests that you use the correct subject heading in your email. This helps them categorize your query or request and respond to it efficiently.
Additionally, Eskom provides an online platform called DocHub, which allows you to fill out and sign the Eskom electricity application form electronically. This platform offers a straightforward process, enabling you to register, edit the template, and make any necessary adjustments to the form before submission.
By following these instructions and submitting your application to the correct email address, you can ensure that your Eskom electricity application is properly directed and processed.
Electric Guitar Origins: 1937 and the Birth of a Legend
You may want to see also
Explore related products

Building your own electricity connection
Eskom offers a self-build connection project that allows you to get connected to the national power grid faster. This option is ideal for those who want to build their own electricity connection.
Solar Panels
Solar panels, also known as photovoltaics (PV), are an effective way to generate electricity by harnessing sunlight. These panels are made of photovoltaic cells that convert sunlight into electricity. Solar panels can be installed on rooftops or on the ground, and they don't require direct sunlight to function, although stronger sunlight will result in more electricity generation. This option is suitable if your area receives at least four hours of sunlight per day.
Wind Turbine
Wind turbines are another option for generating electricity, particularly if your area experiences strong winds. Wind turbines utilize large blades that catch the wind flow, and the stronger the wind, the more electricity is produced. There are two main types of domestic wind turbines: pole-mounted and building-mounted. Pole-mounted turbines are freestanding and installed in areas with strong crosswinds, while building-mounted turbines are smaller and often placed on rooftops with sufficient wind availability. Before installing a wind turbine, check the zoning restrictions in your area for maximum structure height, as these systems can be quite tall.
Biomass or Biogas Systems
Biomass or biogas systems are ideal if you produce a lot of waste, such as wood chips, paper, or sewage. These systems burn wood pellets, chunks, or chips to generate heat and power. A stove with a back boiler can simultaneously provide water heating, saving costs compared to an electric heating system.
Micro-hydro Systems
Micro-hydro systems utilize running water sources, such as streams or rivers, to generate electricity. While these systems can be expensive upfront, they last for decades and often require minimal maintenance. However, they are highly dependent on the availability of suitable water sources and can impact native species on your property.
DIY Generator
You can also build a simple generator using readily available materials. This DIY generator will only power a small torch bulb, but it operates on the same principles as power station generators. The basic concept involves passing an electric current through a wire, generating a magnetic force field, and converting electrical energy into other forms, such as light or sound.
Remember to check with local authorities and ensure that your chosen method complies with any relevant regulations or restrictions. Additionally, always prioritize safety when working with electricity, and consider seeking professional assistance if needed.